DIY installation
Before starting the installation of FBS, it is necessary to properly prepare the solution and dig a pit (if a building with a basement is planned).

Styling tips
By following the installation rules, you can reduce construction time and save on materials.

The thickness of concrete joints should not exceed 20 mm. The optimal value for single-story buildings is 15 mm.
Concrete slabs must be laid using singapore mobile database equipment (crane, manipulator).
To increase the strength level, reinforcement rods are placed between the slabs and filled with cement mortar.
In order for the slabs to adhere well, the solution must be prepared correctly. It must be freshly prepared and have a consistency similar to thick sour cream.

FBS masonry mortar
To prepare a high-strength solution, the following grades of cement are used:

density - from 1400 kg/cu.m;
fine particles (percentage ratio) - no more than 3%;
clay content - no more than 2-3%;
fraction - 3-5 mm.
The solution is mixed in an iron container or concrete mixer. It is necessary to observe the proportions (2 parts cement and 1 part sand).

Construction stages
The construction takes place in several stages. A pit is dug under the FBS blocks. The boundaries of the site where the construction is carried out are determined in advance. Stakes are driven into the ground and ropes are pulled over them. The drainage pad is installed layer by layer, using river sand, gravel or crushed stone. The layers (15 cm each) are watered and compacted.