Produce a product A1 Plan production A11 Suggest the structure and method of Mfg. A12 Estimate the required time and cost of production A13 Develop production plans A14 Develop a plan of support activities A2 Create schedule and budget administration A21 Develop a master schedule A22 Develop a work coordination schedule A23 execution and resource consumption A3 Plan the release of products Further detail in the model can be followed by looking at the Detailed Reference Expression (DRE), located just below the block number. This gives the node number, C-number, or page number of the child diagram that details the block.
In the example below, the information for algeria whatsapp number data column 3 in diagram A24 can be found in diagram A243. If the DRE is missing, the block has not yet been detailed. pic30 Details can be used within a model or shared between different models. In both cases, a call arrow (pointing down) indicates where the shared detail is via a reference expression, which can include a unique abbreviated model name. In the example below, block 4 is detailed by diagram A4 in the MQ model. In this example, the reference expression is a reference to a diagram node.
Order of reading the diagram The exact information about the system is contained in the diagrams themselves. The following reading sequence is recommended: Review the diagram blocks to get an idea of what is being described. Go back to the parent diagram and pay attention to the arrow connections to the parent block. Try to identify the “most important” input, control signal, and output. Examine the arrows in the current diagram. Try to determine if there is a main path that links the “most important” input or control signal and the “most important” output.
Estimate costs and acquire resources A24 Monitor schedule
-
jarinislamfatema
- Posts: 207
- Joined: Tue Jan 07, 2025 4:38 am