The distance from the plug to the nearest bracket should not exceed 250 mm.
Posted: Tue Feb 18, 2025 6:53 am
Ensuring stability against deformation under vertical load
The distance between the gutter brackets should not exceed 600 mm. The funnel should be fixed at two points (or on two extensions). The gutter connector should be fixed at one point (or on one bracket). The bc data indonesia of the corner element should be located no more than 150 mm from the nearest bracket.
Providing compensation for thermal linear expansion
The gutter must be installed in the mating elements up to the line with the inscription "Insert up to now". For ease of installation, point micro-stops are formed along the edges of the line, up to contact with which the gutter is inserted. The distance from the end surface of the plug to the elements of the house structure must be at least 30 mm.
Ensuring the sealing of the drainage system
Before installation, clean the mating surfaces from dirt, make sure that rubber sealing gaskets are present and that they are tightly installed in the sockets. The gaskets must reach the ends of the sockets. All plugs must be installed. The ends of the gutters must protrude beyond the side cut of the roof by 50-100 mm.
Comparison of gutter performance under load
Mounting Features
Roofing with a frontal board. Fastening on plastic brackets
The plastic bracket, funnel and connector are attached with screws directly to the fascia board. To secure the gutter in the plastic bracket, first insert the edge of the gutter closest to the fascia board into the bracket clamp. Then, lowering the gutter into the bracket receiver and pressing hard on the opposite edge of the gutter together with the clamp, insert the edge into the clamp until it clicks. When attaching to the fascia board, it is necessary to strengthen the connection of the board with the roof to prevent it from being pulled out under the load of snow.
The distance between the gutter brackets should not exceed 600 mm. The funnel should be fixed at two points (or on two extensions). The gutter connector should be fixed at one point (or on one bracket). The bc data indonesia of the corner element should be located no more than 150 mm from the nearest bracket.
Providing compensation for thermal linear expansion
The gutter must be installed in the mating elements up to the line with the inscription "Insert up to now". For ease of installation, point micro-stops are formed along the edges of the line, up to contact with which the gutter is inserted. The distance from the end surface of the plug to the elements of the house structure must be at least 30 mm.
Ensuring the sealing of the drainage system
Before installation, clean the mating surfaces from dirt, make sure that rubber sealing gaskets are present and that they are tightly installed in the sockets. The gaskets must reach the ends of the sockets. All plugs must be installed. The ends of the gutters must protrude beyond the side cut of the roof by 50-100 mm.
Comparison of gutter performance under load
Mounting Features
Roofing with a frontal board. Fastening on plastic brackets
The plastic bracket, funnel and connector are attached with screws directly to the fascia board. To secure the gutter in the plastic bracket, first insert the edge of the gutter closest to the fascia board into the bracket clamp. Then, lowering the gutter into the bracket receiver and pressing hard on the opposite edge of the gutter together with the clamp, insert the edge into the clamp until it clicks. When attaching to the fascia board, it is necessary to strengthen the connection of the board with the roof to prevent it from being pulled out under the load of snow.